Chapter 2 - Pile Types and Guidelines for Selection

For a complete version of this document click here.

If you are looking for more details, kindly visit our website.

Piles can be categorized in two main types: load bearing piles and sheet piles.

There are numerous types of load bearing piles. Figure 2-1 shows a pile classification system based on type of material, configuration, installation technique and equipment used for installation. Load bearing piles can also be classified based on their method of load transfer from the pile to the soil mass. Load transfer can be by friction, toe bearing or a combination.

2.1. Bearing Piles

2.1.1. Steel Piles

The general category of steel piles includes H-piles and pipe piles. Since steel piles are a manufactured product, their properties are controlled and well known prior to installation. Among all piling materials steel piles are allotted the highest allowable unit working stresses, but not necessarily the highest in proportion to the ultimate strength of the material. Steel piles are generally considered to be high capacity piles but have been historically used for a wide range of loadings.

2.1.1.1. Steel H-Piles

Steel H-piles are a specially designed sub-group of wide flange shapes with equal thickness in the web and flanges. The depth of the section is approximately equal to the width. H-piles are hot rolled from ingots on the same type mill used to manufacture wide flange structural shapes. A table of the various sizes commonly available is shown in Table 2-1. Other wide flange shapes have been used for foundation piles in special situations.

H-piles are very versatile pile type. They can be used for both friction and end bearing applications. They are manufactured as a finished product, which can be driven with standard equipment. Advantages and disadvantages of H-Piles are shown in Table 2-2.

H-piles can be considered for a design load between 80 kips (356 kN) and 500 kips ( kN). They function most efficiently for end-bearing or partial end-bearing applications. They are a standard in many states for highway bridge piers and abutments where the job sites are remote, compacted fill approach embankments must be penetrated, battered piles are often required and pile loadings are in the medium to high medium range (80 kips (356 kN) to 180 kips (800 kN)).

 

H-piles are also commonly applied for high unit dead and live loads associated with multi-story buildings. The magnitude of these loads generally requires high capacity piles driven to end-bearing conditions to limit settlements and for space and economic reasons. H-piles have carried design loads of over 400 kips ( kN) in a number of such applications.

H-piles are good piles in tension – the constant cross-section together with the entrapment of soil between the flanges provides excellent resistance to pullout when that is a factor. H-piles are used as battered tension piles to anchor sheet pile bulkheads. Uplift due to hydrostatic or wind conditions is an important consideration in many foundation designs, and steel H-piles have the ability to work both as compression and tension piles. Their low-displacement characteristic would favor H-piles over displacement piles where ground heave might be a problem.

The ability to resist hard driving enable H-piles to penetrate soils where other piles may not.

2.1.1.1.1. Grades of Steel H-Piles

Steel H-piles are produced to either ASTM Specification A-36 or A-572. The properties for these specifications (and their grades) are shown in Table 2-3. In addition, they can be produced to ASTM A-690 when specified. This formulation is a 50 ksi (345 MPa) steel with improved corrosion performance in the salt-water splash zone. This grade is occasionally specified as ”weathering” type steel for appearance-sake above ground.

Experience indicates that corrosion is not a practical problem for steel piles driven in natural soil, due primarily to the absence of oxygen in the soil. However, in fill ground at or above the water table, moderate corrosion may occur and protection may be needed. Commonly used protection methods include coatings applied before driving. Coal-tar epoxies, fusion bonded epoxies, metallized aluminum and Phenolic mastics are used to provide protection. Encasement by cast-in-place concrete or precast concrete jackets or cathodic protection can also provide needed protection for piles extending above ground. Sometimes heavier sections are used to meet long-term service requirements.

Splices are commonly made by full penetration butt welds. The splice should be as strong as the pile. Proprietary splicers are also used for quick splicing H-piles.

A steel load transfer cap is not required if the head of the pile is adequately embedded in a concrete cap.

H-piles may require toe reinforcement for driving through dense soil or soil containing boulders or rock. Toe reinforcement is also used for penetration into a sloping rock surface. Proprietary pile points welded to pile toes are used commonly. H-piles are suitable for use as end bearing piles, and combinations of friction and end bearing. Since H-piles generally displace a minimum of material, they can be driven more easily through dense granular layers and very stiff clays. Using H-piles often reduces the problems associated with soil heave and ground vibrations during foundation installation. H-piles can be used for driving into soils containing obstructions such as boulders when properly protected at the toe. They are commonly used for any depth since splicing is relatively easy.

2.1.1.1.2. H-Piles as End-Bearing Piles

H-piles are most efficient when they can be driven to refusal or practical refusal on rock, or into dense materials overlying rock. The pile functions as a short column, hence the rock may be stronger than the steel for the maximum design load that can be applied. It is generally accepted that competent rock in its natural bed can resist very high stress concentrations without crushing, except when the pile is installed through extremely soft soils. This combination therefore provides at least the potential for some high and therefore very efficient pile loadings. Other end-bearing materials include hardpan, marl, dense sand, and softer rock. Here the strength of the supporting material is often considerably less than that of the steel. H-piles driven into these materials obtain support by the development of an increased bulb of pressure around the toe and friction along the embedded development length.

Building codes set limits on loads and unit stresses as well as allowable settlements, which reflect the experience and recommendations of the related engineering community. Piles installed to end bearing are often permitted much higher loads than friction piles and those that are tested are allowed higher loads than those that are not.

Based on recorded experience, H-piles are probably most efficient when driven through relatively deep, soft to medium stiff clays to end bearing.

Fine grained soils (clays) are the most likely to exhibit large increases in capacity after installation. The extent to which soil freeze contributes to capacity of end-bearing piles is subject to much discussion. Soil freeze may be estimated using experience and static methods. With wave equation analysis, incorrect modeling of the setup (freeze) effects may lead to the discrepancies that are observed between estimated and actual driving performance.

2.1.1.1.3. H-Piles as Friction Piles

While many meters of H-piles have been driven for friction applications, they are non-displacement piles and tend to drive further in loose sands and silty sand. There may be good reasons however to select H-piles for this use if, for example, a significant scour depth is computed for a bridge pier abutment.

When H-piles are driven into stiff clays with cohesion between 1 and 2 ksf, soil is usually trapped between the flange and the web and is compacted. In this case, the soil becomes a part of the pile and is carried down with it. An example of this (known as “H-pile plugging”) is shown in Figure 2-2. This core aids in compressing the surrounding soil and building up resistance to further displacement. The principal load transfer is through frictional forces and not from end bearing. It is somewhat difficult to predict the capacity of any given length of pile driven in stiff clays and load testing is generally advisable. When soft or medium clays and silts are encountered, piles will develop shaft friction resistance almost equal to the surface area of the pile multiplied by the shear strength. These soils have high moisture content, which will make the pile resistance to driving seem lower than predicted. A time interval of a few hours to several weeks may be necessary to attain the true measure of the pile’s long term geotechnical capacity.

2.1.1.1.4. H-Piles as Soldier Beams

You will get efficient and thoughtful service from Jianhua Holdings Group.

One common application of H-piles is their use as soldier beams for retaining walls. These retaining walls can be either permanent or temporary for excavations and braced cuts. Typically, the H-piles are driven on 6’ – 8’ (1.8 – 2.4 m) centers in a row with the flanges facing each other. The lagging – either concrete or timber – is then stacked with the ends of the flanges facing the webs. The flanges of the H-piles thus retain the lagging. Cross bracing (in the case of braced cuts) or tieback systems can be used to provide additional lateral support for higher walls or loads.1 H-piles also are used in conjunction with sheeting to form high-modulus walls; these are discussed in detain in the Pile Buck Sheet Piling Design Manual.

2.1.1.2. Steel Pipe Piles

Pipe piles usually consist of seamless, welded or spiral welded steel pipes of wall thickness in the range of 0.109” to 2.500” (2.8 – 63.5 mm). The piles are available in 8” (203.2 mm) to 48” ( mm) diameters. Typical pipe pile sizes are shown in Table 2-4. Much larger sizes and also used in special situations.

Common sizes of pipe piles can be considered for loads between 60 kips (267 kN) to over 400 kips ( kN). They are very competitive as combination end-bearing/friction piles for loads from 120 kips (534 kN) to 240 kips ( kN), driven closed-end and filled with concrete (particularly where pile lengths do not favor mandrel-driven piles.) Pipe also provides a strong casing for concrete fill where underground pressures are high. Pipe piles may be driven with an open end or a closed end.

Advantages and disadvantages of steel pipe pile are shown in Table 2-5.

2.1.1.2.1. Specifications

The basic specification for pipe piles is ASTM A-252, which covers welded and seamless product. There are three grades listed:

• Grade 1 has a minimum yield strength of 30 ksi (207 MPa);

• Grade 2 has a minimum yield of 35 ksi (241 MPa); and

• Grade 3 has a minimum yield of 45 ksi (310 MPa).

There are elongation requirements for ductility, but only minimum chemistry requirements.

2.1.1.2.2. Manufacture

Seamless pipe is rarely specified for pipe piles due to its relative cost. It generally comes on the market as surplus pipe. As the name implies, seamless pipe has no seams but is made in one piece from a hot steel billet by piercing the centre and expanding the steel to the shape and size desired.

Electric weld pipe is the most common type of pipe used for piles. Several manufacturing processes can be used:

• Electric resistance welding

• Fusion welding

• Flash welding.

The seams of these pipes may be straight, spiral-butt or spiral-lap construction. In each case, the manufacturer begins with hot rolled sheets or plates in either coils or flats. The production equipment determines how the pipe is assembled and the seams are welded. So-called “spiral mills” produce spiral pipe by butting or lapping the seams. This process accounts for a large share of the pipe pile produced. Larger and thicker pipe piles are generally made on the same mills which produce large diameter line pipe by the straight seam, electric butt-weld process. In some cases very heavy wall pipe piles are fabricated in specialty shops where penstocks or caissons might be fabricated. There seems to be no particular advantage of one process over the other as far as the pile foundation designer is concerned.

2.1.1.2.3. Closed Ended Pipe Piles

A closed ended pipe pile is shown in Figure 2-3. They may be filled with concrete or left unfilled. They may be filled with a structural shape such as an H-section in addition to the concrete and socketed into bedrock (rock socketed piles). If bearing capacity from the entire pile toe area is required, the pile toe should be closed with a plate or a conical tip. Mandrels are usually not used for driving pipe piles, which are generally driven from the pile head. When the end of a pipe pile is equipped with a closure device, the pile becomes a displacement pile and functions well as a friction pile particularly in loose sands. When driven open or closed end it can also function as a high capacity end-bearing pile.

A flat plate of 1/2” to 2” (13-51 mm) thickness, or a conical point generally forms a closed ended pile. When pipe piles are driven to weathered rock or through boulders, a cruciform end plate or a conical point with rounded nose is often used to prevent distortion of the pile toe.

2.1.1.2.4. Open Ended Pipe Piles

Open-ended pipe piles are driven when hard driving, caused by the presence of debris, small boulders and the like is anticipated. The pipe can be fitted with a special driving shoe, which adds steel thickness at the toe to reduce stresses and damage. Periodically, the plugger materials are removed to aid in driving. Open-ended pipe piles may also be partially socketed into rock at site of steeply sloping bedrock or where pile fixity at the toe is a design requirement. Pipe piles driven open-end may be filled with concrete  after cleaning out the plug, backfilled with sand, or the plug ignored. In the last two cases, the steel wall takes all stress and the pile would be treated similar to an H-pile for design purposes.

In driving through dense materials, open-ended piles may form soil plugs. The plug may make the pile act like a closed end pile and increase the pile toe bearing capacity significantly. The plug should not be removed unless the pile is to be filled with concrete. For open-ended pipe piles not filled with concrete, the formation of soil plug should not be considered in computing pile end bearing capacity. Behavior of the plug during and after driving is a function of pile size and soil type and consistency. Only preliminary design guidance is available, which should always be confirmed by field observations and measurements.

This type of pile is also common in the installation of offshore oil platforms, whether driven from the surface or underwater. In these applications, they primarily are designed for uplift loads due to wave or wind action on the structure. Unless the pile plug generated during driving creates drivability problems, the plug is generally not removed. An illustration of this application is shown in Figure 2-4.

Open ended pipe piles are recommended where the pile or pile group is to be subjected to horizontal loads and bending moments such as vessel impact and scour on large structures such as bridges. With a constant radius of gyration, pipe piles are also the most efficient columns and should be considered where freestanding columnar strength is important (such as open-platform marine piers and docks). This is advantageous in seismic situations, where liquefaction and several other factors have a strong influence on the design of deep foundations. In all of these applications, the pile size can range up to mm in diameter. Since such applications can require considerable length, this frequently requires adding-on to pipe piles, which is shown in Figure 2-5.

An example of this kind of application was the Jamuna River Bridge in Bangladesh, built in the mid-’s. The river is capable of scouring to a depth of 50 m, with a flood discharge of 100,000 m3/sec. To deal with this, groups of high yield strength piles – mm in diameter up to 80 m long with a wall thickness of 45 – 60 mm were installed. After driving, the plug was removed and the toe of the pile was sealed with concrete, then the pile was grouted.

Want more information on High Strength Concrete Pipe Pile? Feel free to contact us.

Pipe Pile Design - Eng-Tips

Design a structure on piles in a coastal environment subject to liquefaction and just had some basic questions on pile design in general:

1) What code governs steel pipe pile, H Pile, or concrete filled pipe pile design. Reading old threads on Eng Tips and they talk about a corrosion allowance for the wall thickness, and they mention 0.08 mm/year or something similar, as a low end. What code is that specified in? They then talk about the design life of the structure as being only 50 years . . . is there a standard of care specified for what design life would be appropriate. I presume you would simply base your design capacity on the pile shape subtracting out the thickness from corrosion based on corrosion per year

2) What goes into determining wall thickness on a pipe pile. We haven't got a full geotechnical report yet, but know the general capacity of an 18" diameter pipe pile is 245 to 280 kips. I know the basics out of the IBC: 5 to 10 feet of unbraced length is required, and that IBC has further guidelines based on the selected hammer for the pile. But a 10'-0" tall column with a 1/4" wall is easily good for 245 kips. Yet neighboring projects have 1/2" wall or are 16" driven pipes with concrete and a full rebar cage.

2) What factors determines whether you should place concrete into the pipe pile (already understand that for this pile type it would be driven closed ended and cleaned out before concrete placement). Does it just increase the load capacity of the pile. Is the design based on the composite shape or the concrete only (for instance, if you would suspect that the steel would eventually rust away)?

3) What would make you choose an H-pile over a pipe pile? Is it simply between availability, price or a local preference, or is there an engineering reason for one over the other?

3) How does liquefaction affect the unbraced length of the pile? If you have deep deposits of sand and very tall piles, treating the piles as totally unbraced columns would require very large piles just to have a kl/r less than 200.

Mostly looking for a design reference on these. I have CRSI's Drilled Piers design guide, but looking for something similar that covers steel and concrete filled pipe piles. We don't own L-pile and will have the geotechnical engineer cover that. Is this a structure in the water so the piles have an exposed length, or are the piles fully buried?

1) Can't help with code specifics as I'm not American. We have a piling code that is referenced in the building code so pretty straightforward. If there's no equivalent US document, steel piles may just be governed by the steel code. You could also take guidance from the bridge code. 0.08mm/year is at the low end for the tidal/splash zone in an aggressive environment but about OK for permanently submerged if there's no accelerated corrosion, and about midrange for milder tidal/splash environments. I've seen holes in marine piles that indicate average localised corrosion of 0.3-0.5mm/year. Much less for buried piles once well underground even though the groundwater will be salty. You should document what you've allowed for.

2a) Wall thickness has many factors eg strength, robustness, durability and installation. You mentioned 1/4" being plenty but take away 4mm corrosion from your item #1 and it looks a bit skinny. If the pile can be hit by boats or floating debris, you might go thicker or fill with concrete. You also go thicker if there's going to be hard driving. Buried pile installed by vibrating or small hammers means you can go thin.

2b) Concrete fill is underwhelming with regard to strength increase compared with effort. Usually better to go with a thicker steel wall IME. The reasons for fill include getting end bearing capacity, sockets for tension capacity, making connection to the superstructure, and robustness.

3a) Pipe piles have the same strength in all directions and only corrode on one face. H-piles can be quite compact and good for hard driving.

3b) Liquefaction will usually mean the pile is unbraced over the liquefied length and impose loads on the pile. If these piles are fully buried and 18" diameter, you must have around 50' of liquefaction if you're worried about kL/r>200? Dear RiverBeav ,

I will try to respond your questions based on my experience,

1- The selection of H-pile, Pipe pile or concrete filled steel pipe pile depends choice, availability of material, const. speed. I would prefer steel pipe pile and if necessary , i would increase the wall thick and dia. rather than filling with conc.

Some codes suggests corrosion rate .. For the atmospheric corrosion rate, may be taken as 0,01 mm per year in normal atmospheres and as 0,02 mm per year for marine conditions. I have copy and pasted the relevant table of Eurocode 3 Design of steel structures — Part 5: Piling

2- I will suggest the use of 0.4fy for the axial load capacity of pile +CA.

2a- The top 2-3 meters could be concrete filled . I would prefer steel pipe pile without concrete fill.

3- The pipe pile is better for corrosion resistance, stiffness in both direction and end resistance due to plug formation.

4- The layer which could liquify during a seismic event , could be assumed without lateral soil support.

I will suggest you to look a novel practice API RECOMMENDED PRACTICE 2A-WSD (Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms )


Thanks for the responses! These piles would be 100% buried but are about one block from the ocean, and the soils they are going through are corrosive. Talked to the geotech yesterday, and he was going to give guidelines about the corrosion.

Note that some of the questions related to things I was seeing on other projects. On one major project that I am peripherally involved in has I think 12" pipe piles that are anywhere between 70 to 120 feet long in a river soil with high liquefaction potential. I just see the drawings and the geotech report, but never was involved in the actual design. I suspected that the geotech must have determined that only certain layers in the soil profile was liquefiable.

Thanks

Comments

Please Join Us to post.

0

0/2000

Guest Posts

If you are interested in sending in a Guest Blogger Submission,welcome to write for us.

Your Name: (required)

Your Email: (required)

Subject:

Your Message: (required)

0/2000